FACTORY AUTOMATION
Factory Automation
H-VAC Module Auto Assembly Line
- Cycle Time : 25 sec/1core
- The equipment which assembles a heater unit and evaporator unit.
Heater Tank Assembly Line
- Cycle Time : 15 sec/1core
- Assembled the Heater Core and Tank
Core Air-Leak Test System
- Cycle Time : 12 sec/1core
- The equipment helps to separate the fixture out of core and move to proof test and air leak test process.
Core Sealing Machine
- Cycle Time : 14 sec/1core
- The equipment attaches the seal and transfer the goods
Radiator Tank & Gasket Assembly Line
- Cycle Time : 15 sec/1core
- The equipment assembles the tube, gasket seal, radiator tank for producing the radiator
Evaporator Assembly Line
- Standard applied core size
- - Header to Header : 150 ~ 350mm
- - Side to Side : 150 ~ 300mm
- Cycle Time : Max 30sec./1Core